Client
Dutchess County

Location
Poughkeepsie, NY

Services
Landfill Cap Installation
Fill Cap Installation
Drainage Construction
Drum Removal
Waste Relocation

Project Value
$8,836,000

Project Duration
September 2005 - August 2007

Next Project
Valeant Pharmaceuticals
Back To Projects
View All Projects


Contact Btn
Airport Landfill Capping

Project Description

ROS was contracted to relocate over 80,000 cy of waste and install a landfill cap over the 23-acre municipal county landfill. The landfill cap consisted of 7 layers over the waste: geotextile, gas vent layer, geomembrane, and barrier protection layer, second layer of geotextile, topsoil and vegetative cover. URS had to work within FAA regulations and coordinate closely with the Dutchess County Airport because part of the landfill was on the airport’s property. Storm water drainage features were also constructed as part of the closure. ROS worked closely with the Design Engineer and Construction Managers to resolve many of the field changes that were implemented. Unknown drums were encountered during the waste relocation process. The drums were sampled and over packed in accordance with OSHA requirements, and then disposed of off-site. The project was completed in 15 months with over 34,000 man-hours and zero incidents.

urs logo link